Tongda Pe90-315ABA pipe three-layer co-extrusion production line

  • Release time: 2024-11-25
  • Views: 250

Basic information

Brand
Tongda
Manufacturer date
2000
Type
PE water supply pipe
For equipment total power, equipment operating voltage, equipment appearance or other equipment related information, please contact our sales team

Product description

The equipment was shipped from the factory in 23 years, and the equipment is 9.9% new. The equipment lasts for 3-4 days. The main engine is 75-38, the motor power is 160 kilowatts, and the auxiliary engine is 45-33, and the motor power is 22 kilowatts.

通达Pe90-315ABA管材三层共挤生产线

通达Pe90-315ABA管材三层共挤生产线

通达Pe90-315ABA管材三层共挤生产线

通达Pe90-315ABA管材三层共挤生产线

通达Pe90-315ABA管材三层共挤生产线

通达Pe90-315ABA管材三层共挤生产线

通达Pe90-315ABA管材三层共挤生产线

通达Pe90-315ABA管材三层共挤生产线

Please contact our sales customer service for confirmation of the total power of the equipment, the appearance of the equipment or other detailed information

Status: Sold

Price: 75,020.00

Zhang Fei
Zhang Fei
CEO
Zhang Li
Zhang Li
Sales Manager
Wang Meng
Wang Meng
Sales Executive
Yu Guangyuan
Yu Guangyuan
Sales Manager
Pan Yulei
Pan Yulei
Sales Executive
Pan Zhengxi
Pan Zhengxi
Sales Manager
Li Guiping
Li Guiping
Sales Executive
Zhang Yu
Zhang Yu
Sales Executive